8-15  Price Indices of Investment in Fixed Assets(2007)
        (preceding year=100)
Category Annual
Average
1st
Quarter
2nd
Quarter
3rd
Quarter
4th
Quarter
           
Investment in Fixed Assets 104.0 103.3 103.7 104.1 105.0
   Construction and Installation 105.5 104.1 104.7 105.8 107.5
    Labor Costs  110.3 110.3 110.5 110.4 109.9
    Material Costs 104.7 102.5 103.9 105.1 107.4
      Steel 105.6 101.7 104.4 106.4 109.8
      Wood 106.2 106.1 106.0 106.0 106.9
      Cement 103.2 103.7 102.0 102.9 104.4
      Local Building Materials 103.6 102.9 103.5 103.6 104.6
      Chemical Materials  104.2 102.1 101.6 103.6 109.6
      Electric Materials  105.7 105.8 105.1 104.5 107.4
      Other Materials 103.3 101.5 103.9 103.7 104.0
    Machinery Costs 104.2 104.7 102.4 104.0 105.6
  Purchase of Equipment, 100.8 101.3 101.2 100.3 100.2
   Tools and Instruments
  Other Costs 104.6 104.2 104.8 105.4 104.2