5-9 Newly Increased Production Capacity through Capital Construction(2008) | |||
Item | Total Construction Size |
Under Construction This Year |
|
Coal Mining (10 000 tons/year) | 1698 | 1388 | |
Coal Washing (10 000 tons/year) | 1346 | 1188 | |
Coke (10 000 tons/year) | 943.0 | 853.0 | |
Petroleum Extraction (10 000 tons/year) | 183.1 | 172.4 | |
Petroleum Processing (10 000 tons/year) | 455.0 | 415.0 | |
Capacity of FCC Equipment (10 000 tons/year) | 344.2 | 344.2 | |
Capacity of Coke Equipment (10 000 tons/year) | 740.0 | 632.0 | |
Capacity of Catalytic Reforming Equipment (10 000 tons/year) | 170.0 | 170.0 | |
Capacity of Hydrotreating Equipment (10 000 tons/year) | 550.0 | 545.0 | |
Iron Ore Mining (10 000 tons/year) | 621.4 | 299.4 | |
Iron Ore Processing capacity (10 000 tons/year) | |||
Refined Iron Ore Mine (10 000 tons/year) | 120.0 | 12.6 | |
Pig Iron (10 000 tons/year) | |||
Crude Steel (10 000 tons/year) | |||
Billet (10 000 tons/year) | 0.80 | 0.60 | |
Copper Smelting (ton/year) | 355000 | 329000 | |
Lead Smelting (ton/year) | 4000 | 3000 | |
Aluminum Oxide (ton/year) | 26000 | 26000 | |
Aluminum Machining (ton/year) | 610044 | 536044 | |
Hydro Power Generation (10 000 kw) | 101.0 | 101.0 | |
Thermal Power Generation (10 000 kw) | 756.5 | 743.0 | |
Others (10 000 kw) | 282.9 | 245.9 | |
Length of Transmission Line (over 110kv) (km) | 2005 | 1631 | |
Cement (10 000 tons/year) | 2615 | 2508 | |
Plain Glass (10 000 weight-box/year) | 844.9 | 644.6 | |
Graphite and Carbon Products (ton/year) | 97814 | 95814 | |
Wood (10 000 cu.m/year) | |||
Nitrogen Fertilizers (ton/year) | 769001 | 637941 | |
Phosphate Fertilizers (ton/year) | 82110 | 82110 | |
Potassium Fertilizer (ton/year) | 24500 | 24500 | |
Chemical Pesticides (ton/year) | 60618 | 53718 | |
Extracted Methanol (ton/year) | 1221045 | 821045 | |
Plastics,Colophony and Copolymer (ton/year) | 84157 | 75697 | |
Synthetic Rubber (ton/year) | 14005 | 14005 | |
Tires (10 000 units/year) | 4709 | 3799 | |
Tire Tubes (10 000 units/year) | 4739 | 4409 | |